Case studies
A textile hub was losing raw material it could not trace and running on production data two days old. We connected the looms to a live system without stopping the floor.
- Production data latency: 48h → 0.2s
- Material saved: $240k / yr
Certificate verification took three weeks per batch of manual checking. We replaced the manual loop with a verification layer that answers in under a second.
- Certificates verifiable: 500k+
- Verification time: 3 wks → <1s
Municipal decisions on parking and road health were made on intuition. Scanning units on taxis and real-time computer vision turned the street into a data source.
- Cities mapped: 15
- Data points: 10M+